Engineering
Preliminary tests, analysis and training

- Location
- Laboratory and production in Steinenbronn
Preliminary test and analysis
You send us test pieces and the test task, we draw up the test plan.
- Trial measurementson a preliminary test set-up; you receive the data sets for your process design
- Characteristic valuestypical figures of your part as the basis for limits and test sequence
- Measurement capability analysesinvestigating whether a test method is suitable for the required tolerance
Training
So that everyone knows what was actually measured – for test planners, quality managers and operators, related to your test task.
- Measurement uncertainty
- Fluid dynamics
- Flow and leak measurement
- Operation and function of our instrumentsat your site, related to the current measuring task
Put your request together
Put together the details of your test task. In the next step you add your contact details in the contact form, where your answers are already filled into the message.


